Skip to content
OLYMPUS Construction

Bathroom remodel · Salt Lake County

Bathroom remodel with a planning range you can check tonight — and a bid after we measure

Planning starts at $171/sq ft on the Good finish level (about $13,680 for an 80 sq ft bath). 25% off new projects booked through an in-home estimate.

Walk-in showers, vanities, tile, and primary suites — including flood rebuilds. Free weekday visit.

Use this page to book a bath visit. The quiz puts you on the calendar. The planning figures above come from the same quote tool on the site; they are not the final bid.

Susie Crandall hired us after a flooded master bathroom and wrote that the tile, plumbing, electrical, demo, paint, and glass were handled without complaint. Linda Blackhurst wrote that her master bath was finished in a timely way.

Your new bathroom starts with one short visit. Pick a time that works for you.

OLYMPUS Construction · Holladay-based · (801) 209-9920 · Monday–Friday, 7:00 AM – 6:00 PM

For a deeper service overview, see Bathroom remodeling. Full bathroom remodeling page

Tub and shower with marble subway tile, blue-green mosaic borders, and gold fixtures
Mosaic tile tub shower

How it works

  • 1. Take the quiz or call

    Book through olympusconstruction.org or call (801) 209-9920. Weekdays, 7 AM to 6 PM.

  • 2. We see the room

    Showers, tubs, waterproofing, and what's in the walls get checked before anyone promises a schedule.

  • 3. Written estimate

    Scope and price in writing. Free 3D design is included with bath projects; the bid still follows the visit.

Step one is easy: choose a day and time for your free visit.

Plan the bathroom around daily use

A bathroom remodel should solve more than a dated tile pattern. Think about who uses the room, where towels and toiletries go, whether two people need the vanity at once, and whether the door interferes with a fixture. A guest bath, a busy family bathroom and a primary suite usually need different priorities. Bring a short list of problems and a few reference photos to the estimate.

Decide which existing features are worth keeping. Retaining fixture locations may simplify some work, but keeping a poor layout just to avoid a plumbing discussion can leave the same everyday frustration in a newly finished room. The visit is the time to weigh those tradeoffs against the available space.

Waterproofing comes before decorative tile

Tile and grout are visible finishes, not a complete waterproofing plan. A shower needs a compatible assembly behind and beneath those finishes, including its base, drain connection, wall system, seams and penetrations. Ask how the selected system is installed and which checks apply before tile covers it. Niches, benches and transitions need the same attention as the main walls.

If there has been a leak, find and address its cause before rebuilding. Staining or soft material can indicate a wider problem than the visible spot. The full condition may only become clear after demolition. Discuss how concealed damage is documented and how any proposed additional work is approved rather than assuming it is part of a cosmetic tile replacement.

Showers, vanities and the details that affect fit

Measurements matter most where components meet. Shower glass depends on the finished opening, a vanity must leave room for doors and drawers, and a faucet must suit the chosen sink. A tile pattern needs a layout that avoids awkward narrow cuts at prominent edges. Confirm fixture dimensions and material choices together instead of selecting each item in isolation.

For a tub-to-shower conversion, discuss drain location, shower dimensions, entry height, water containment and the effect on the rest of the room. If easier access is a priority, raise it during design. Grab-bar backing, reachable controls and usable clearances are easier to plan before walls are closed. A residential renovation should not be described as compliant with an accessibility standard without reviewing the actual requirements.

What should be included in the written scope

The estimate should explain demolition, disposal, waterproofing, tile coverage, plumbing fixtures, vanity, countertop, lighting, ventilation, glass, paint and trim as applicable. Identify owner-supplied products and allowances clearly. Ask whether the shower glass is ordered after tile installation and whether an additional measurement visit is needed. These dependencies affect both price comparisons and the installation sequence.

A full bath rebuild is different from changing a vanity or replacing a shower. Be specific about what remains untouched, especially flooring outside the room and wall finishes beside new tile. Document selection changes so a different fixture or tile pattern does not quietly turn into a different project.

Timing, permits and keeping another bathroom available

A bathroom sequence can include demolition, concealed repairs, rough plumbing and electrical work, inspections, waterproofing, tile, finish fixtures and glass. Some materials require drying or curing time, and custom glass may follow later than the tile. Olympus confirms the proposed schedule after seeing the room rather than promising every bathroom will be completed in a fixed number of days.

Ask the local building department which permits apply to the planned work; requirements vary with scope and jurisdiction. Confirm application, inspection and fee responsibilities in writing. If this is the only bathroom in the house, discuss alternative arrangements before work begins. In a home with several bathrooms, consider sequencing projects so another room remains usable.

Compare bathroom projects by construction, not just appearance

A lower total is not automatically a better value if it leaves out ventilation, waterproofing or finish repairs. Compare the same tile area, fixture quality and preparation work. Ask what happens if demolition reveals damaged framing or an unsuitable subfloor, and how that discovery changes the written scope. An early planning range is not a substitute for assessing the actual room.

Olympus schedules bathroom estimates from its Holladay base throughout the published service area, including Sandy and Salt Lake City. Browse the related city and service pages for kitchens, baths and steam-shower planning. When the project is ready for a site conversation, use the quiz or call to arrange a free visit.

Frameless glass shower with black hardware, marble walls, hex floor, black bench, plantation shutters, black marble floor, and a freestanding tub
Marble shower and tub
Green bathroom with oak vanity cabinets, a black counter, and gold faucets and mirrors
Green bath vanity
Bathroom with a gray-brown vanity, white marble counter, and a glass shower lined in blue stone tile
Bathroom with blue stone shower

What homeowners wrote

  • “I like that they were able to do smaller jobs and appreciate the owner reaching out and thanking us for business.”

    Susie Crandall · Master bath after a flood

  • “Our bathroom looks beautiful. The owner Esra and the project manager Kate were very personable and they genuinely cared about me their client and the quality of their work.”

    Linda Blackhurst · Master bathroom

More reviews

Related pages

Questions

How much does a bathroom remodel cost with OLYMPUS?

A bathroom remodel with OLYMPUS Construction in Salt Lake County starts at $171 per square foot on the Good finish level in the quote tool, $266 on Better, and $399 on Best. A 80 square foot project at the Good rate is $13,680. Those figures are planning estimates from square footage times a finish level, and the written bid comes after a free in-home visit.

Do you take smaller bath jobs?

Yes. Susie Crandall hired us after a flooded master bathroom and wrote that she was glad we would take a smaller job. The written bid still comes after a free visit.

Is the online number the final price?

No. Planning figures are square footage times a finish level. OLYMPUS Construction confirms the bid after measuring the room.

How do I get started?

Take the short quiz at olympusconstruction.org to book a visit, call (801) 209-9920, or use the on-site quote tool. Hours are monday–friday, 7:00 am – 6:00 pm.

What should I ask about shower waterproofing?

Ask which waterproofing system, shower base and drain assembly are proposed, how seams and penetrations are handled, and which inspections or tests apply. Tile and grout alone are not the waterproofing system. The written scope should describe the assembly before installation.

Can you give me a bathroom completion date before a visit?

A dependable schedule requires a room assessment and an agreed scope. Fixture availability, concealed repairs, inspections, curing time and glass measurements can affect sequencing. Discuss the proposed schedule and bathroom downtime at the estimate.

Ready for an estimate?

Take the short quiz to book a visit, or call. We measure, then write the price. Mon–Fri 7 AM–6 PM.

Bathroom Remodeling in Salt Lake County, UT | Olympus Construction